"Should be around five hundred bucks." It sounds friendly. It's also how a lot of arguments start.
Say you quote a homeowner "around $500" to stain their deck. Halfway through, you find rotted boards. You replace them, because you're a decent person, and you bill $780. They remember "$500." You remember "around." Now you're both annoyed, and one of you is writing a review.
A short written estimate stops most of this before it happens. Plain words are fine. What matters is that you both read the same thing. If you send estimates from the same place you keep your customers, they can accept it online, and it turns into the invoice later without retyping anything.
Estimate, quote or contract: what's the difference?
- Estimate: your best guess at the price. It can change, so say how and why it might.
- Quote: a set price for a set job. If the job stays the same, the price stays the same.
- Contract: a signed agreement that both of you are bound by.
People use these words loosely, and so do plenty of businesses. That's fine, as long as your paper says plainly whether the price is fixed or could move.
What should a written estimate include?
The FTC's home improvement advice lists most of these, including one people forget: any promise you made out loud. If you said it, write it down.
- Your business name, address, phone number and license number, if your trade is licensed.
- The customer's name and the job address.
- The scope of work, in plain words.
- What's not included.
- Materials, with brand, grade or color where it matters.
- The price, broken into parts where that helps the customer understand it.
- How long the price is good for.
- Estimated start and finish dates.
- The payment schedule, including any deposit.
- How changes will be handled and priced.
- Your cancellation terms.
- A place to sign and date, or a button to accept.
How detailed should the scope be?
Detailed enough that a stranger could read it and know when the job is done. Compare these two:
- Vague: "Paint living room."
- Clear: "Paint walls and ceiling of the living room, about 14 by 18 feet. Two coats. Customer picks the color. Eggshell on walls, flat on ceiling. Fill small nail holes. Trim, doors and closet not included. We'll move furniture to the middle of the room and cover it."
That "not included" line saves more arguments than anything else on the page. Most customers will assume the closet comes with the room unless you say otherwise.
What does a simple estimate look like?
Here's a made-up example for a house wash, so you can see how the pieces fit together on one page:
- Job: soft wash of vinyl siding on a two-story house, all four sides, plus the front walkway and back patio.
- Not included: roof, windows from the inside, deck staining, and moving anything heavier than patio chairs.
- Price: house $425, walkway and patio $150, total $575. Good for 30 days.
- When: the week of May 11, weather permitting. Rain dates are offered by text.
- Payment: $75 deposit to book, balance due the day the work is done, by card or payment link.
- Changes: anything extra is priced and agreed in writing before we start it.
- Accept: sign or click accept to book your date.
That's it. It fits on a phone screen, and the customer knows exactly what they're getting. The prices above are only for the example, not a guide to what you should charge.
What happens when the job changes halfway through?
Jobs change. Walls hide surprises, and customers have new ideas once they see the first half done. The fix is a change order: a short written note saying what's changing, what it costs and how it affects the timeline, agreed to before you do the extra work.
Back to that deck. With a change order, you'd stop, text a photo of the rotted boards and write: "Replacing 6 boards adds $280 and half a day. OK to go ahead?" Then you'd wait for a yes. Same $780 bill at the end, and no surprise. A signed change form is best, but even a written yes by text beats a verbal "sure, go for it" that nobody remembers the same way.
Keep a copy of everything
Every signed estimate, change order and "yes, go ahead" text should end up in one place, attached to that customer. Six months from now, when they call about a warranty question or want the same job again, you'll want to pull it up in seconds instead of scrolling through a year of texts. Storing them on the customer's record in a CRM makes that easy, and it means anyone on your crew can find the paperwork, not just you.
Do electronic signatures count?
For most everyday business deals in the U.S., yes. The federal ESIGN Act says a signature or contract can't be denied legal effect just because it's electronic. Some documents still have special rules, so if you work in a field with its own paperwork requirements, check those. This isn't legal advice.
In the CRM, you can send estimates and contracts with signature fields, from a template or an uploaded PDF. It records a signing certificate with the signer's IP address, email and time, can include a pricing table, and can go out automatically when a customer books or fills out a form. That record matters if anyone ever asks, "Did I really agree to that?"
What New Hampshire rules should home contractors know?
If you work on people's homes in New Hampshire, RSA 359-G is worth knowing. When the contract amount is over $5,000, the contractor has to give the homeowner written notice that the contractor has a right to try to fix claimed defects before the homeowner sues. The notice has to stand out, and it can be part of your contract. The law even provides the wording to use, starting with "NEW HAMPSHIRE LAW, RSA 359-G, CONTAINS IMPORTANT REQUIREMENTS."
Under that law, a homeowner with a complaint has to send written notice at least 60 days before filing suit, and the contractor gets 30 days to respond with an offer, a request to inspect or a rejection. Putting that notice in your estimate template once means you never forget it on a big job.
If you sign the deal at the customer's kitchen table, there's also a three-day cancellation rule to know about. Our article on taking deposits covers that one. This isn't legal advice, so have a New Hampshire lawyer look over your estimate template once. It's a small cost next to a single bad dispute.
How do you get more estimates accepted?
- Send it the same day. The company that answers first often gets the job.
- Make yes easy. In the CRM, customers accept or decline an estimate online, and an accepted one can become the invoice.
- Offer a choice. Two or three options, like "basic" and "with the trim," let people pick instead of deciding yes or no.
- Ask for photos first. A quote form that takes photo uploads can get you close to a real price before you drive out.
- Follow up once. A friendly text two or three days later catches the people who meant to say yes and got busy.
Full disclosure: we sell these tools. Estimates, invoicing and e-signed documents come with our Complete Platform at $300 a month, and forms start on the $150 plan. You can compare every plan on our plans and pricing page.
Prices as of November 2026, taken from our current plans.
Common mistakes
- Giving a number out loud and never writing it down.
- Leaving out what's not included.
- No expiration date, so a customer shows up in June holding last October's price.
- Doing extra work first and talking about the price after.
- Burying the deposit and payment schedule at the bottom, where nobody reads.
- Using a template from another state without checking your own state's rules.
When isn't a full written estimate needed?
Small jobs with a posted price don't need a whole document. If a basic haircut is $40 and it says so on your website, that price list is your estimate. Emergency calls are another case: you can't write a detailed scope at 2 a.m. with water pouring through a ceiling. Before you start, though, at least text your hourly rate and any trip charge, and get a yes back.